
Description
Destiny Homes presents their Tulsa floor plan in Urbandale's Waterford Ridge. This ranch plan features 4 bedrooms, 3 baths, and over 1200 square feet of finished space on the main. Great split bedroom plan on the main with a guest room/office in the front of the home and open concept layout in the back of the home with access to the master off the living area. Open concept kitchen/dining/living area that features a large island, corner pantry, electric fireplace, large picture windows and a slider off the back of the home to a covered patio. The finished lower level includes 2 bedrooms, bathroom, family room and plenty of room for storage. There is a long list of standard features including electric fireplace, smart home automation, quartz counter tops, passive radon system and 2x6 construction. Plus ALL appliances are included! Ask about $2,000 in closing costs provided by preferred lender. As of 06/21/22 house is in mechanical rough-in stage - approximately 75 days until completion.
-
4BEDS
-
0.19ACRES
-
3BATHS
-
01/2 BATHS
-
1,277SQFT
-
$305$/SQFT
Description
Destiny Homes presents their Tulsa floor plan in Urbandale's Waterford Ridge. This ranch plan features 4 bedrooms, 3 baths, and over 1200 square feet of finished space on the main. Great split bedroom plan on the main with a guest room/office in the front of the home and open concept layout in the back of the home with access to the master off the living area. Open concept kitchen/dining/living area that features a large island, corner pantry, electric fireplace, large picture windows and a slider off the back of the home to a covered patio. The finished lower level includes 2 bedrooms, bathroom, family room and plenty of room for storage. There is a long list of standard features including electric fireplace, smart home automation, quartz counter tops, passive radon system and 2x6 construction. Plus ALL appliances are included! Ask about $2,000 in closing costs provided by preferred lender. As of 06/21/22 house is in mechanical rough-in stage - approximately 75 days until completion.